City of Pearland, TX
Home MenuShadow Creek Parkway Landscaping, Street Lighting & Sidewalks and Shadow Creek Trail Phase II
About. The Shadow Creek Parkway Landscaping, Street Lighting & Sidewalks and Shadow Creek Trail Phase II projects will improve safe vehicular travel and alternative transportation for pedestrians travelling from residential areas to commercial, entertainment and educational venues. The trail would connect Shadow Creek Trail via the Clear Creek Relief Channel bridge to the Clear Creek Trail and provide a multi-use path to the future Shadow Creek Library.
The recently developed Multi-Modal Master Plan will be utilized to assist in the development of multi-use paths along Shadow Creek Parkway. The Multi-Modal Master Plan encapsulates the Trails Master Plan and Sidewalk Gap Analysis in addressing future existing needs for the City's trails, sidewalks, bicycle, and way finding needs. The Shadow Creek Parkway Landscaping, Street Lighting and Sidewalks project is located in the TxDOT right of way and will require partnership with TxDOT.
The Shadow Creek Trail Phase II will connect the new trail along Clear Creek to the trail within the Shadow Creek Ranch development that is located along the Clear Creek Relief channel.
During the review of these projects, it was determined that due to the close proximity of the work that combining the projects would make the most sense. Both projects are basically the same in nature and comprise of concrete paths, landscaping and lighting.
Scope. The Shadow Creek Parkway Landscaping, Street Lighting and Sidewalks will consist of approximately 15,000 LF of 6' and 10' Sidewalks, installation of 5 pedestrian bridges, installation of street lighting (Centerpoint or City maintained), and installation of landscaping improvements along with an irrigation system. Landscaping improvements are required to meet standard City requirements for major thoroughfares.
The Shadow Creek Trail Phase II - Along Clear Creek Relief Ditch and Library Trail will consist of approximately 1,600 LF of 10-foot wide hike and bike trail along the Clear Creek Relief Channel and include a pedestrian bridge over the channel. Additionally, a 500-foot trail will be installed to connect the Shadow Creek Ranch Library to the Shadow Creek Ranch Trail.
Both projects were submitted to the TIRZ #2 and were approved to receive funding.
Schedule
Base Line | Current | |
Design Start | September 2020 | November 2020 |
Bid Start | January 2022 | September 2022 |
Construction Start |
October 2022 |
|
Proposed Construction Completion | July 2023 |